The works in the Spotify Camp Nou advance to good rhythm during this month of August. In the case of the third gradería, there is big advances regarding the construction of the structure that has to bear this part of the future stadium. At least 70% of the beams and pillars already have been planted from the zone of the Goal South with Grandstand until the Goal North. Now, only it expects emplazar the signposts of formwork before carrying out the hormigonado.

The workers have installed several andamios with the end to accelerate the phase of the previously mentioned construction. Likewise, already they have been planted the majority of the ménsulas that have to bear the ring VP. However, one of the zones with fewer advances during the last days is the Grandstand, although the operarios already work in this part of the structure. It fits to stand out that the inferior flats already were hormigonados in spite of the heat in Barcelona.

Besides, the operarios are centred in the Goal South with the aim to arrive to the level of street in the Travessera of Them Corts. On the other hand, the constructor already has a new access for the vehicles from the Avinguda Joan XIII, to facilitate the works in this zone of the coliseo Barcelona. In the case of the cimentaciones of the parking in the zone of Goal South with Side, already can appreciate a lot of advances.

In the interior work according to the planned

The works in the interior of the stadium of the FC Barcelona fulfil with the terms established. In this moment, the works to plant the concrete with the end to avoid leaks, and his conditioning for the placing of the seats is about to to finish. Although, there are some pending works in Grandstand and in the zone of the corner of Goal North.

In this context, the installation of the inferior part of the first gradería finds almost smart. Besides, the mouths of access in the second gradería advance to good rhythm. So much the president of the Barça, Joan Laporta, like the rest of the directors of the Catalan institution, are convinced that they will be able to house parties in the future stadium before it finalise this year.